
Commercial
Offices, headquarters, retail and logistics buildings, from shell and core through to full fit-out.
148 projects completed →General contractor since 1987
Halden builds for developers, property owners and public bodies. We price openly, run our own site teams, and have handed over 94% of our projects on or before the agreed date.
412 projects handed over since 1987
What we build
Each sector has its own contracts director and site teams who build that type of project and nothing else.

Offices, headquarters, retail and logistics buildings, from shell and core through to full fit-out.
148 projects completed →
Apartment blocks, mixed-tenure schemes and student housing, including refurbishment of occupied buildings.
9,300 homes delivered →
Bridges, road and rail structures, water and utilities works for public bodies and network owners.
61 structures built →Projects
Six of 412. Ask us for references in your sector and we will put you in touch with the client.
Ask for references
About us
Halden started in 1987 as a concrete frame contractor with eleven people. Today 640 of us work from four regional offices, and we still employ our own site managers, engineers and core trades instead of subcontracting everything out.
For you that means one team from tender to handover, a site manager who has built your type of project before, and a contracts director who answers the phone.
How we work
We meet on site, review your drawings and budget, and say plainly whether we are the right contractor. You get a written scope summary within five working days.
Cost plan, programme, buildability review and supply-chain pricing. You get a fixed price or an open-book target cost with every allowance listed.
Your named site manager runs the job day to day. You get a fortnightly report with photos, cost position and a three-week look-ahead.
Snags are closed before handover, not after. You get as-built drawings, manuals and a defects visit already in the diary.
Sustainability and safety
We report carbon and safety figures to clients in the same fortnightly report as cost and programme, so you see them while there is still time to act.
“In month two Halden told us the piling would take longer than the tender allowed, and showed us how they would recover it. We opened Meridian House eleven days early.”
Request a quote
An estimator from the right sector team will call you back within two working days. Early-stage enquiries are welcome; you do not need finished drawings.