← All designsOption 5: Net zero (preview)Designed by ZABNEXUS Technologies LLCzabnexus.com+971 58 139 3965hello@zabnexus.com
Residential tower with trees and shrubs growing on every balcony, seen against an evening sky

General contractor for commercial, housing and infrastructure

Buildings that give back more than they take.

Halden builds offices, homes and public buildings in timber, with planted roofs and their own power, at close to the cost and programme of a conventional build.

  • 62% less embodied carbon than a typical build
  • 38 buildings generating their own power
  • Every project carbon-measured, from first delivery to year two

Our carbon numbers

Measured, not promised.

We count carbon from the quantities actually delivered to site, not from design-stage estimates, and an independent assessor checks the model before handover. The operating figure comes from two years of metered energy use, projected over 60 years.

Read the two-page method statement

Whole-life carbon per m² of floor area, over 60 years
  • Materials
  • Construction on site
  • 60 years of operation

Typical new building1,500 kgCO₂e/m²

Materials 520 · Construction 80 · Operation 900

A Halden building408 kgCO₂e/m²

Materials 190 · Construction 38 · Operation 180

73% less over the building's life. Materials and construction alone come to 228 against 600, which is 62% less. Halden figure: average of our 14 buildings with two full years of meter data. Typical figure: benchmark for a concrete-and-steel building of the same type and size.

How we get there

Four things do most of the work.

None of them is experimental. We have built each one dozens of times, and we price them in every tender.

Heavy glulam timber beams of a building frame against a blue sky

Mass timber structures

Frames, floors and cores in cross-laminated timber and glulam, up to 12 storeys, in place of concrete and steel.

41 timber-framed buildings completed since 2016

Building facade with balconies and plants hanging down from each floor

Living roofs and facades

Planted roofs and balconies hold back storm water, shade the building in summer and protect the roof membrane.

27,400 m² of roof and facade planted to date

Rows of solar panels installed on a flat rooftop

On-site solar and heat pumps

No gas connection. Roof arrays and heat pumps cover heating, cooling and hot water from day one.

6.2 MWp of solar installed across 38 buildings

Carpenter in a helmet and hi-vis jacket cutting a length of timber on site

Reused and low-carbon materials

Reclaimed steel, cement-replacement concrete and recycled aggregate, each logged in a materials passport.

34% of materials by weight reused or recycled, on average

Projects

Every building leaves with a carbon label.

Like the label on a fridge, but for the whole building. The figures come from delivery records and meters, and we publish the ones we are less proud of too.

Two residential towers with planted balconies seen from street levelHousing

Alder Court

Northbridge · 142 homes over 9 storeys · completed 2025

Carbon label Checked at handover

Carbon rating A

Embodied carbon
212 kgCO₂e/m²
Timber in structure
71%
Energy use
38 kWh/m² a year
Generated on site
41% of annual use
Read the Alder Court carbon report
Modern office building faced in glass and timber panelsCommercial

Mill Quay Offices

Easthaven · 11,400 m² of offices · completed 2024

Carbon label Checked at handover

Carbon rating A

Embodied carbon
236 kgCO₂e/m²
Timber in structure
64%
Energy use
52 kWh/m² a year
Generated on site
61% of annual use
Read the Mill Quay carbon report
Timber-clad buildings with sharp roof lines under a blue skyPublic

Fernhill Primary School

Westmere · 420 pupils, built around a live school · completed 2025

Carbon label Checked at handover

Carbon rating B

Embodied carbon
268 kgCO₂e/m²
Reused or recycled material
48%
Energy use
44 kWh/m² a year
Generated on site
104% of annual use
Read the Fernhill carbon report
Curved timber and glass arched hall under an open skyInfrastructure

Harrow Lane Interchange

Castlebrook · bus and rail interchange · completed 2023

Carbon label Checked at handover

Carbon rating C

Embodied carbon
412 kgCO₂e/m²
Reused steel and aggregate
37%
Energy use
58 kWh/m² a year
Generated on site
28% of annual use

Concrete platforms kept this one at C. We publish it anyway.

Read the Harrow Lane carbon report

Rating bands, embodied carbon in kgCO₂e/m² (materials plus construction): A under 250, B 250 to 400, C 400 to 550. A typical new building sits near 600.

People walking across the curved, grass-covered roof of a building

A roof can be a park, a power station and a rainwater tank. We build it to be all three.

Site worker in a hard hat standing on a timber frame against a blue sky

Process

From brief to a building that runs itself.

One team and one contract from the first carbon model to the last meter reading.

  1. Measure the baseline

    We model your brief as a conventional building first, so every later saving has a number to beat.

    Weeks 1 to 3

  2. Design the carbon out

    With your architect we test frame, facade and services options, and price each one in money and in carbon.

    Weeks 4 to 14

  3. Build it clean

    Frames arrive prefabricated, site plant runs on electricity, and every delivery is logged against the carbon budget.

    9 to 16 months on site

  4. Monitor it for 2 years

    After handover we meter the building, tune the systems each season, and send you the real figures every quarter.

    24 months, included in the contract

Costs and time

Slightly more to build. Much less to own.

Averages across our last 14 completed projects, each measured against the conventional tender for the same brief.

+1.8%
build cost, repaid in 6 years of energy savings
5 weeks
shorter on site, because timber frames arrive cut to size and go up dry
−58%
energy bills, metered over the first two years of occupation

Where it does cost more: planted facades need two maintenance visits a year. That is priced into your quote, not discovered after handover.

Two site workers in yellow vests and white helmets reviewing figures on a tablet
Interior of a building with exposed timber walls and ceiling beams

“Halden's tender came in 1.6% above the concrete option and we let the building five weeks early. Two years on, the energy bills are less than half what our other offices pay.”

Marta Lindqvist, Development Director, client for Mill Quay Offices

Request a quote

Get a price and a carbon figure for your project.

Send the brief, or just the site and floor area. Within five working days you get a budget cost, a programme and a carbon estimate, set beside the conventional option.

Call the estimating team
020 7946 0135
Head office
14 Wharf Row, Northbridge NB1 4HT
Hours
Monday to Friday, 8:00 to 17:30

A named estimator replies within one working day.